Torchlight Energy Resources, Inc. reported that the operator of its Hazel Project has completed hydraulic fracturing operations.
The project is located in the Midland Basin and targets the Wolfcamp A and B formations.
The stimulation went according to plan with the targeted frac delivered at approximately 3,200 lbs. per foot and an 80 barrels per minute water rate consisting of 37 stages. A total of 592,000 barrels of water and 24,000,000 lbs. of sand were used in the stimulation.
Flowback is scheduled to commence next week.
Related Categories :
Frac Design
More Frac Design News
-
Carrizo Changing Frac Design After Lackluster Well Performance -
-
Point Loma Changes Completion Plan for First Rex Oil Well; Larger Size Fracs
Permian News >>>
-
Why $90 Oil Isn’t Bringing Back the Rigs -

-
These Three Companies Will Increase Drilling & Completion Over The Next 3 Year -

-
Q1 A&D Transactions Jump to $30B , While Deal Flow Was Down 40%

-
Wright to U.S. Oil Industry: The Price Signal Is Telling You to Drill

-
Apa Corp : Doing More With Less

Permian - Midland Basin News >>>
-
Permian Resources to Grow Production 6% in 2026

-
Battalion Oil Closes ~$60M West Quito Draw Asset Sale

-
Deal Rumor: ConocoPhillips Exploring $2B Permian Asset Sale

-
This Operator Will Chop it's 2026 Rig Count From 34 to 24 -

-
A Quiet Capital Pattern Is Forming in North American Upstream — and Almost No One Is Talking About It -

