Oil Sands | Incidents / Accidents
Suncor: Mildred Lake Facility Incident Will Not Affect 2017 Guidance
Suncor updated the Syncrude Mildred Lake Oil Sands facility following the March 14 incident.
Syncrude has developed a detailed repair schedule and return to service plan that includes the completion of a planned turnaround which Syncrude advanced in order to minimize the impact of the outage. The plant is currently operating at reduced rates and Suncor will continue to assist in inventory management.
The investigation and inspection show that damage was largely isolated to a piperack adjacent to the hydrotreater. An accelerated repair schedule has been developed to achieve restart of pipeline shipments at approximately 50% capacity in early May and production is expected to return to full rates by the end of June.
Suncor does not expect this outage to result in a change to overall production guidance for 2017 as strong production from oil sands and offshore operations is expected to offset the impact.
Related Categories :
Incidents / Accidents
More Incidents / Accidents News
-
Coastal Operators Assessing Damage Following Hurricane Ida
-
Ecopetrol Details Ops, Challenges as Colombian Unrest Continues
-
Gran Tierra Updates Ops Amidst Colombian Protests
-
UPDATED: Saudi Oil Output to Return to Normal by End of the Month Post-Attack
-
CNRL Restarts Pelican Lake, Woodenhouse Ops After Wildfire
Canada News >>>
-
Western Canada Upstream M&A: Q1 2026 Transaction Report

-
Canadan E&P 2026 Program Calls for 448 Net Wells, Up 24% vs. 2025 Plan -

-
EIA’s “Glut” Calls: The 2025 Surplus Claim — and How 2021–2024 Forecasts Actually Held Up

-
Whitecap Details 2026 Duvernay & Montney Program

-
ARC Resources: Lower 2026 Capex, Higher Volumes

